The 'Column Display' checkboxes in the Configure Settings page of the Change Events tool controls which columns are available on the Detail tab of the Change Events tool. A tick in the box indicates the setting is enabled and the columns associated with that setting are turned ON. To disable one (or both) settings, remove the checkmark(s) from the box(es).
The default settings for the 'Column Display' on new Procore projects are as follows:
Always click 'Save' after modifying the tool's settings. For instructions, see Configure Settings: Change Events.
The table below details which columns are available for each setting combination:
Column | A & B Enabled | A & B Disabled | Only A Enabled | Only B Enabled |
---|---|---|---|---|
Sub Job | 1 | 1 | 1 | 1 |
Cost Code | ||||
Cost Type | ||||
Description | ||||
Vendor | ||||
Contract | ||||
UOM | ||||
Production Qty | 2 | 2 | 2 | 2 |
Production UOM | 2 | 2 | 2 | 2 |
Revenue: Unit Qty | ||||
Revenue: Unit Cost | ||||
Revenue: ROM | ||||
Revenue: Main PV | ||||
Revenue: Latest Price | ||||
Cost: Unit Qty | ||||
Cost: Unit Cost | ||||
Cost: ROM | ||||
Cost: RFQ | ||||
Cost: Commitment | ||||
Cost: Non-Commitment | 3 | 3 | 3 | 3 |
Cost: Latest Cost | ||||
Over/Under | ||||
|
1 You must separately enable/disable the 'Sub Jobs' column. For instructions, see Enable Sub Jobs on Projects for WBS.
2 You must separately enable the 'Production Qty' and 'Production UOM' columns. For instructions, see Enable the Labour Productivity Cost Features for Project Financials.
3 You must separately enable the 'Non-Commitment' Costs column. For instructions, see How do I track non-commitment costs on a change event?