Add an Existing Submittal to a Submittal Package

Objective

To add an existing submittal to a submittal package

Background

submittal package is a container that stores one or more submittals. Typically, a main contractor creates submittal packages that list all of the individual submittals specific to a particular trade or subcontractor. For example, one might create a submittal package to contain all of the plumbing-related submittals in a commercial building project.

If you have existing submittals that have not yet been added to a package, you can add one (1) of more of those submittal's to a package using the steps below. 

Example
Let's say you are working in a collaborative environment and the subcontractors on a construction project are responsible for loading their submittal items into Procore. After loading their submittal items into the Procore project, the project manager then adds these existing submittal items into a new submittal package before sending it out for a design team review.

Things to Consider

Steps

  1. Navigate to the project's Submittals tool. 
    This reveals the Submittals page. 
  2. Click the Packages link. 
    This reveals a list of all of your project's submittal packages. 
  3. Locate the desired submittal package and click Edit.
    This places the submittal package into edit mode. 
    Note: The Edit button is only visible and available if your project has individual submittals that can be added to a package. 
  4. Scroll down to the 'Add Existing Submittals to this Package' area. 
  5. If you want to narrow the number of submittals in the table, select a filter parameter from the Filter List by Spec Section list. 
  6. Place a mark in the checkbox(es) that correspond to the existing submittal(s) that you want to add.

    add-existing-submittals-to-this-package.png

    This adds the selected submittals to the package and a yellow banner appears at the top of the table to show the total number of selected submittals.
    Note: To remove all of the selected submittals from the package, click Clear. 
  7. Click Update.
    A GREEN banner appears at the top of the submittal package's page to confirm that the submittal was updated successfully. 

Next Steps