Add a Visual to a Custom Project Report

Objective

To add a visual to a custom project report.

Things to Consider

  • Required User Permissions:
    • To add a visual to a custom project report that you created:
      • 'Standard' level permissions or higher on the Project level Reports tool
        AND
      • 'Read Only' level permission or higher on the tool being used as the data source (e.g., If you are creating a custom submittals report, you will need permission on the project's Submittals tool).
    • To add a visual to a cloned custom project report:
      • Access to the cloned copy as its creator. See Clone a Custom Project Report.
        Note: If a visual was added to the original report before you cloned the report, your cloned copy will include the original visual. You can remove the original visual from your cloned copy of the report and add your own visual.
  • Additional Information:

Steps

  1. Navigate to the Project level Reports tool.
  2. In the Reports tab, locate the desired report.
  3. Click the report to open it.
  4. Click + Add Visual.

    add-horizontal-bar-chart.png
     
  5. Enter a name for your new visual in the Descriptive Title box.
  6. Next to Type of Visual, click the desired button to specify which visual to create.
    Note: Depending on the visual, you will have the ability to select different measures on which the report's calculations can be made. 
     
    Type of Visual Description Purpose  Measure If you select this option, do the following:
    icon-reports-bar.png Bar A bar graph is best used for visualizing trends and to represent changes over a period of time. COUNT, SUM, AVG, MIN, MAX
    1. Select one of the supported measures from the Measure list.
    2. Select one of the available values from the Value list.
    3. Select the desired Category from the list.
    icon-reports-donut.png Donut A donut (a.k.a., pie chart) is best used for showing relative proportion and to represent percentages.  COUNT, SUM
    1.  Select one of the supported measures from the Measure list.
    2. Select one of the available values from the Value list.
    3. Select the desired Category from the list.
    icon-reports-line.png Line A line chart is best used for visualise trends by connecting data points over a period of time. COUNT, SUM, AVG, MIN, MAX
    1. Select one of the supported measures from the Measure list.
    2. Select one of the available values from the Value list.
    3. Select the desired Category from the list.
    icon-reports-stacked-bar.png Stacked Bar A stacked bar chart is best used for visualizing trends and to represent changes over time. It is helpful to use a bar chart when you require slightly more detail than a bar graph COUNT, SUM, AVG, MIN, MAX
    1. Select one of the supported measures from the Measure list.
    2. Select one of the available values from the Value list.
    3. Select the desired Category from the list.
    4. Select the desired Second Category from the list. 
    icon-reports-horizontal-bar.png Horizontal Bar A horizontal bar chart is best used for comparing data categories. COUNT, SUM, AVG, MIN, MAX
    1. Select one of the supported measures from the Measure list.
    2. Select one of the available values from the Value list.
    3. Select the desired Category from the list.
    4. Select the desired Second Category from the list. 
    icon-reports-gauge.png Gauge A gauge is best used for visualizing data that requires attention. It allows you to set a number or percentage threshold for your gauge. COUNT
    1. Select one of the supported measures from the Measure list.
    2. Select one of the available values from the Value list.
    3. Select one of the available filters from the Filter list.
    4. Select the desired threshold value from the Turn Yellow if its Greater Than list.
    5. Select the desired threshold value from the Turn Red if its Greater Than list.
    6. Click the number or percentage button in the Show Thresholds As area.
  7. Click Save.
  8. Optional: If you want export your report with your new visual, click Export and select PDF with Visuals.