Objective

To view a Site Production Report.

Background

Production quantities are a measurable amount of work on a construction project. For example, cubic yards of concrete, number of light fixtures or linear feet of piping. In Procore, there are two types of production quantities:

  • Budgeted production quantities refers to the measurable amount a team plans to install on a project.
  • Installed production quantities refers to the actual amount installed on a project by a point in time.

The Field Production Report provides Procore users with the ability to compare a construction project's budgeted production quantities with its installed production quantities. With the appropriate permissions, you can view this report with the project's Reports or Timesheets tool. 

Things to Consider

  • Required User Permissions: 
    • 'Read Only' permission or higher on the project's Reports tool.
      AND
    • 'Read Only' permission or higher on the project's Timesheets tool.
  • Prerequisites:

Steps

From the project's Reports tool

  1. Navigate to the project's Reports tool.
  2. Scroll to Project Reports.
  3. Click Site Production Report.

    field production report reports tool.jpg

    This reveals the Site Production Report. To learn about the data columns, see Which data columns are in a Site Production Report?

    FPR-accurate-12-13-18.jpg
     
  4. Click Add Filter to narrow the display results.
    filter button.jpg
     
  5. Select one of the following:
    • Cost Code
    • Sub Job Name
    • Unit Of Measure

From the project's Timesheets tool

  1. Navigate to the project's Timesheets tool.
  2. Click Reports.
  3. Click Site Production Report.

    field production report timesheets.jpg

    This reveals the Site Production Report. To learn about the data columns, see Which data columns are in a Site Production Report?

    FPR-accurate-12-13-18.jpg
     
  4. Click Add Filter to narrow the display results.

    filter button.jpg
     
  5. Select one of the following:
    • Cost Code
    • Sub Job Name
    • Unit Of Measure